Inspection Report
Silom Tower B
Silom District, Bangkok · Mixed-use high-rise
Mission ID
M-20260515
Survey Date
15 May 2026
Duration
31 min
Max Altitude
22.4 m
Progress
40%
Compliance
91%
within 1 cm tolerance
BIM Deviation Stats
Maximum deviation2.9 cm
Average deviation0.6 cm
Compliance (≤1 cm)91%
Initial survey. 2 defects flagged. Structure at 40% completion. Minor surface irregularities on east facade.
0Critical
1Medium
1Low
AiRial · DINOv3 inference
Detected Defects
| Defect ID | Type | Location | Deviation | Confidence | Severity |
|---|---|---|---|---|---|
| D-0515-01 | spalling | Floor 2 · east | 1.9 cm | 81% | medium |
| D-0515-02 | water staining | Floor 1 · west | 0.7 cm | 74% | low |
Generated by AiRial · Developed by AGICAFET · 15 May 2026 · Mission M-20260515