Inspection Report
Asok Office Complex
Sukhumvit, Bangkok · Commercial office
Mission ID
M-20260520
Survey Date
20 May 2026
Duration
22 min
Max Altitude
12.8 m
Progress
28%
Compliance
95%
within 1 cm tolerance
BIM Deviation Stats
Maximum deviation1.8 cm
Average deviation0.4 cm
Compliance (≤1 cm)95%
First survey. 1 low-severity defect. Foundation work complete, framing underway.
0Critical
0Medium
1Low
AiRial · DINOv3 inference
Detected Defects
| Defect ID | Type | Location | Deviation | Confidence | Severity |
|---|---|---|---|---|---|
| D-AO-0520-01 | crack | Floor 1 · east | 1.2 cm | 78% | low |
Generated by AiRial · Developed by AGICAFET · 20 May 2026 · Mission M-20260520