Inspection Report

Silom Tower B

Silom District, Bangkok · Mixed-use high-rise

Mission ID

M-20260610

Survey Date

10 June 2026

Duration

42 min

Max Altitude

25.6 m

Progress

62%

Compliance

88%

within 1 cm tolerance

BIM Deviation Stats

Maximum deviation3.5 cm
Average deviation0.8 cm
Compliance (≤1 cm)88%

3 defects detected. Crack on Floor 3 NW has widened since May. New rebar exposure flagged on Floor 5.

2Critical
1Medium
0Low
AiRial · DINOv3 inference

Detected Defects

Defect IDTypeLocationDeviationConfidenceSeverity
D-0610-01crackFloor 3 · north3.1 cm92%critical
D-0610-02rebar exposureFloor 5 · south3.8 cm89%critical
D-0610-03spallingFloor 2 · east2.3 cm85%medium

Generated by AiRial · Developed by AGICAFET · 10 June 2026 · Mission M-20260610