Inspection Report
Silom Tower B
Silom District, Bangkok · Mixed-use high-rise
Mission ID
M-20260610
Survey Date
10 June 2026
Duration
42 min
Max Altitude
25.6 m
Progress
62%
Compliance
88%
within 1 cm tolerance
BIM Deviation Stats
Maximum deviation3.5 cm
Average deviation0.8 cm
Compliance (≤1 cm)88%
3 defects detected. Crack on Floor 3 NW has widened since May. New rebar exposure flagged on Floor 5.
2Critical
1Medium
0Low
AiRial · DINOv3 inference
Detected Defects
| Defect ID | Type | Location | Deviation | Confidence | Severity |
|---|---|---|---|---|---|
| D-0610-01 | crack | Floor 3 · north | 3.1 cm | 92% | critical |
| D-0610-02 | rebar exposure | Floor 5 · south | 3.8 cm | 89% | critical |
| D-0610-03 | spalling | Floor 2 · east | 2.3 cm | 85% | medium |
Generated by AiRial · Developed by AGICAFET · 10 June 2026 · Mission M-20260610